The contents of the container should be stored in a dry, cool environment away from direct sunlight and with proper ventilation. Prevent the color from freezing. Close the container tightly after use. The best time to use construction paint is up to 30 months after the date of production if proper storage conditions are observed.
Before painting the construction paint by separating the loose points, opening the cracks and seams. Prepare the surface by removing peeling paint. Then, if needed, use plaster or putty to smooth the work surface and then sand it. The final surface before painting must be clean and free of any pollution, dust or grease. Then, gradually mix the color of all matte plastic with the right amount of water and apply it on the surface. (The amount of mixing water with paint in terms of weight percentage is 25%-30% with a brush, 5%-10% with a roller and 35%-40% with a gun). After finishing work, wash your hands, painting tools or materials spilled on the floor with warm soapy water.
Keep out of reach of children. If this substance is swallowed, do not force the person to vomit and go to the medical center as soon as possible. In case of contact with eyes, rinse immediately with plenty of water.