The contents of the container should be stored in a dry, cool environment away from direct sunlight and with proper ventilation. Prevent the color from freezing. Close the container tightly after use. The best time to use construction paint is up to 30 months after the date of production if proper storage conditions are observed.
Before using construction paint, wash the desired surface with water to remove dust and dirt from the surface. (If the surface is covered with dandruff, it must be cleaned with a brush). Before painting, it is necessary to make the desired surface clean and free of any pollution, grease and even old colors. For cement surfaces, you can use the water jet method to clean the surface. In this case, you should make sure that the surface is completely dry before applying one. If necessary, repair the surface with a suitable acrylic sealer to obtain a completely smooth and smooth surface. Then, gradually mix the shiny acrylic construction paint with the right amount of water and apply it on the surface. (The amount of mixing water with paint in terms of weight percentage is -%1520% with a brush, -10%15% with a roller, and -%2025% with a gun). After finishing the work, wash your hands, painting tools or materials spilled on the floor with warm water and soap.
Keep out of the reach of children, if this substance is swallowed, do not induce vomiting and go to the medical center as soon as possible. In case of contact with eyes, rinse immediately with plenty of water.